Jadual Pengangkutan

Jadual Pengangkutan Dan Tambang

 

Jadual Pelayaran Feri Kenderaan 2017

 

Labuan - Menumbok

6.00 am – 7.30 am

Putera Jaya 1

7.30 am – 9.30 am

Wawasan Perdana

8.30 am – 10.00 am

Galaxy

10.30 am – 12.00 pm

Kimanis 1

11.30 am – 1.00 pm

Putera Jaya 1

1.30 pm – 3.30 pm

Wawasan Perdana

3.30 pm – 5.30 pm

Kimanis 1

5.30 pm – 7.00 pm

Goodwill Star

6.30 pm – 8.00 pm

Galaxy

7.00 pm – 9.00 pm

Wawasan Perdana

 

Menumbok – Labuan 

6.00 am - 7.30 am

Galaxy

8.00 am – 9.30 am

Kimanis 1

9.00 am – 10.30 am

Putera Jaya 1

10.30 am – 12.30 pm

Wawasan Perdana

11.30 am – 1.30 pm

Galaxy

1.00 pm – 2.30 pm

Kimanis 1

2.30 pm – 4.00 pm

Putera Jaya 1

4.30 pm – 6.30 pm

Wawasan Perdana

6.30 pm – 8.00 pm

Kimanis 1

8.30 pm – 10.00 pm

Goodwill Star

10.00 pm - 12.00 am

Wawasan Perdana

 

Labuan – Muara, Brunei

8.30 am – 10.30 am

Goodwill Star

4.30 pm – 5.45 pm

Shuttle Hope

 

Muara, Brunei – Labuan

9.15 am – 11.30 am

Shuttle Hope

2.30 pm – 4.30 pm

Goodwill Star

 

 

 

BOT EXPRESS 3888
Labuan - Menumbok

 8.15 am

2.15 pm

 

 

 

 

BOT EXPRESS 3888
Labuan - Menumbok

 9.45 am

3.45 pm

 

 

Maklumat Perhubungan

 

Wawasan Perdana

Labuan Ferry Corp.

087 – 417 333 (Labuan)

Warisan Perdana

087 – 831 333 (Menumbok)

Putera Jaya 1

Labuan Mainland & Juta Bonus

087 – 443 244 (Labuan)

Kimanis 1

Goodwill Star

087 – 831 079 (Menumbok)

Galaxy

 

KADAR TAMBANG PERKHIDMATAN FERI DI LALUAN LABUAN – MENUMBOK (SEHALA)

 

 

BIL

 

JENIS KENDERAAN

KADAR (RM)

1

Penumpang - Dewasa

5.00

2

Penumpang – 12 tahun ke bawah dan penuntut

2.50

3

Kereta Biasa (Dengan Pemandu)

40.00

4

Kereta Komersial/ Single/ Double Cabin/ Pacuan 4 Roda/ Van Persendirian (Dengan Pemandu)

50.00

5

Basikal

8.00

6

Motosikal (Penunggang)

250 cc ke bawah

15.00

250 cc ke atas

30.00

 

7

 

Bas (dengan pemandu)

 

a)

Van (13 seater ke bawah)

60.00

b)

Coaster (14-19 seater)

80.00

c)

Mini Nas (20-24 seater)

100.00

d)

Bas (25-34 seater)

195.00

e)

Bas (35 seater ke atas)

300.00

 

8

 

Lori (dengan pemandu)

TANPA MUATAN (RM)

DENGAN MUATAN (RM)

a)

2 Tan / P-UP 1 Tan

50.00

75.00

b)

3 Tan (BTM) / BDM 5 Tan – 14 Tan

75.00

90.00

c)

4 Tan (BTM) / BDM 14 Tan – 15 Tan

90.00

120.00

d)

5 Tan (BTM) / BDM 15 Tan – 16 Tan

100.00

150.00

e)

6 Tan (BTM) / BDM 16 Tan – 17 Tan

120.00

180.00

f)

7 Tan (BTM) / BDM 17 Tan – 18 Tan

140.00

210.00

g)

8 Tan (BTM) / BDM 18 Tan – 19 Tan

160.00

240.00

h)

9 Tan (BTM) / BDM 19 Tan – 21 Tan

205.00

270.00

i)

10 Tan (BTM) / BDM 21 Tan – 23 Tan

250.00

300.00

j)

11 Tan (BTM) / BDM 23 Tan – 24 Tan

450.00

550.00

k)

12 Tan (BTM) / BDM 24 Tan – 25 Tan

500.00

600.00

l)

13 Tan (BTM) / BDM 25 Tan – 26 Tan

550.00

650.00

m)

Treler/Kontena 20 kaki panjang (BDM > 25 Tan)

770.00

870.00

n)

Treler/Kontena 40 kaki panjang (BDM > 28 Tan)

980.00

1,080.00

9

Kren

TANPA LOW LOADER (RM)

DENGAN LOW LOADER (RM)

a)

Kren/Jengkaut (Excavator)

770.00

1,080.00

 

Nota:

                BTM = Berat Tanpa Muatan

                BDM = Berat Dengan Muatan

 

 

Carian

Mutiara Kata

Ketika terbukti salah, orang bijak akan memperbaiki dirinya sendiri dan orang yang bodoh akan terus berdebat

Hakcipta Terpelihara oleh Jabatan Kerja Raya Wilayah Persekutuan Labuan 2017 adalah tidak bertanggungjawab ke atas kerugian yang dialami atas penggunaan maklumat yang terkandung di laman ini.

Please publish modules in offcanvas position.