Jadual Pengangkutan

Jadual Pengangkutan Dan Tambang

 

Jadual Pelayaran Feri Kenderaan 2017

 

Labuan - Menumbok

6.00 am – 7.30 am

Putera Jaya 1

7.30 am – 9.30 am

Wawasan Perdana

8.30 am – 10.00 am

Galaxy

10.30 am – 12.00 pm

Kimanis 1

11.30 am – 1.00 pm

Putera Jaya 1

1.30 pm – 3.30 pm

Wawasan Perdana

3.30 pm – 5.30 pm

Kimanis 1

5.30 pm – 7.00 pm

Goodwill Star

6.30 pm – 8.00 pm

Galaxy

7.00 pm – 9.00 pm

Wawasan Perdana

 

Menumbok – Labuan 

6.00 am - 7.30 am

Galaxy

8.00 am – 9.30 am

Kimanis 1

9.00 am – 10.30 am

Putera Jaya 1

10.30 am – 12.30 pm

Wawasan Perdana

11.30 am – 1.30 pm

Galaxy

1.00 pm – 2.30 pm

Kimanis 1

2.30 pm – 4.00 pm

Putera Jaya 1

4.30 pm – 6.30 pm

Wawasan Perdana

6.30 pm – 8.00 pm

Kimanis 1

8.30 pm – 10.00 pm

Goodwill Star

10.00 pm - 12.00 am

Wawasan Perdana

 

Labuan – Muara, Brunei

8.30 am – 10.30 am

Goodwill Star

4.30 pm – 5.45 pm

Shuttle Hope

 

Muara, Brunei – Labuan

9.15 am – 11.30 am

Shuttle Hope

2.30 pm – 4.30 pm

Goodwill Star

 

 

 

BOT EXPRESS 3888
Labuan - Menumbok

 8.15 am

2.15 pm

 

 

 

 

BOT EXPRESS 3888
Labuan - Menumbok

 9.45 am

3.45 pm

 

 

Maklumat Perhubungan

 

Wawasan Perdana

Labuan Ferry Corp.

087 – 417 333 (Labuan)

Warisan Perdana

087 – 831 333 (Menumbok)

Putera Jaya 1

Labuan Mainland & Juta Bonus

087 – 443 244 (Labuan)

Kimanis 1

Goodwill Star

087 – 831 079 (Menumbok)

Galaxy

 

KADAR TAMBANG PERKHIDMATAN FERI DI LALUAN LABUAN – MENUMBOK (SEHALA)

 

 

BIL

 

JENIS KENDERAAN

KADAR (RM)

1

Penumpang - Dewasa

5.00

2

Penumpang – 12 tahun ke bawah dan penuntut

2.50

3

Kereta Biasa (Dengan Pemandu)

40.00

4

Kereta Komersial/ Single/ Double Cabin/ Pacuan 4 Roda/ Van Persendirian (Dengan Pemandu)

50.00

5

Basikal

8.00

6

Motosikal (Penunggang)

250 cc ke bawah

15.00

250 cc ke atas

30.00

 

7

 

Bas (dengan pemandu)

 

a)

Van (13 seater ke bawah)

60.00

b)

Coaster (14-19 seater)

80.00

c)

Mini Nas (20-24 seater)

100.00

d)

Bas (25-34 seater)

195.00

e)

Bas (35 seater ke atas)

300.00

 

8

 

Lori (dengan pemandu)

TANPA MUATAN (RM)

DENGAN MUATAN (RM)

a)

2 Tan / P-UP 1 Tan

50.00

75.00

b)

3 Tan (BTM) / BDM 5 Tan – 14 Tan

75.00

90.00

c)

4 Tan (BTM) / BDM 14 Tan – 15 Tan

90.00

120.00

d)

5 Tan (BTM) / BDM 15 Tan – 16 Tan

100.00

150.00

e)

6 Tan (BTM) / BDM 16 Tan – 17 Tan

120.00

180.00

f)

7 Tan (BTM) / BDM 17 Tan – 18 Tan

140.00

210.00

g)

8 Tan (BTM) / BDM 18 Tan – 19 Tan

160.00

240.00

h)

9 Tan (BTM) / BDM 19 Tan – 21 Tan

205.00

270.00

i)

10 Tan (BTM) / BDM 21 Tan – 23 Tan

250.00

300.00

j)

11 Tan (BTM) / BDM 23 Tan – 24 Tan

450.00

550.00

k)

12 Tan (BTM) / BDM 24 Tan – 25 Tan

500.00

600.00

l)

13 Tan (BTM) / BDM 25 Tan – 26 Tan

550.00

650.00

m)

Treler/Kontena 20 kaki panjang (BDM > 25 Tan)

770.00

870.00

n)

Treler/Kontena 40 kaki panjang (BDM > 28 Tan)

980.00

1,080.00

9

Kren

TANPA LOW LOADER (RM)

DENGAN LOW LOADER (RM)

a)

Kren/Jengkaut (Excavator)

770.00

1,080.00

 

Nota:

                BTM = Berat Tanpa Muatan

                BDM = Berat Dengan Muatan